DNVGL-RP-F115 Pre-commissioning of submarine pipelines.pdf
DNVGL海底管道的预调试推荐做法
节选段落一:
RECOMMENDED PRACTICE
DNVGL-RP-F115 Edition September 2016
Pre-commissioning of submarine pipelines
DNV GL AS
The electronic pdf version of this document found through http://www.dnvgl.com is the officially binding version.
The documents are available free of charge in PDF format.节选段落二:
qualification (planned published 2016, currently published as
DNV-RP-A203)
DNVGL-RP-F109 On-bottom stability design of submarine pipelines (planned published 2016, currently published
as DNV-RP-F109)
DNVGL-RP-F113 Pipeline subsea repair (planned published 2016, currently published as DNV-RP-F113)
DNVGL-RP-H101节选段落三:
topography
— pre-commissioning system design:
— overall pre-commissioning installation/pre-commissioning sequence
— pre-Commissioning battery limits
— component spread requirements:
- compressors and pumps
- pigs and pig trains
- pig launchers and receivers
— pre-commissioning fluids
— space requirements
RECOMMENDED PRACTICE
DNVGL-RP-F115 Edition September 2016
Pre-commissioning of submarine pipelines
DNV GL AS
The electronic pdf version of this document found through http://www.dnvgl.com is the officially binding version.
The documents are available free of charge in PDF format.节选段落二:
qualification (planned published 2016, currently published as
DNV-RP-A203)
DNVGL-RP-F109 On-bottom stability design of submarine pipelines (planned published 2016, currently published
as DNV-RP-F109)
DNVGL-RP-F113 Pipeline subsea repair (planned published 2016, currently published as DNV-RP-F113)
DNVGL-RP-H101节选段落三:
topography
— pre-commissioning system design:
— overall pre-commissioning installation/pre-commissioning sequence
— pre-Commissioning battery limits
— component spread requirements:
- compressors and pumps
- pigs and pig trains
- pig launchers and receivers
— pre-commissioning fluids
— space requirements