Logo 折叠
全网首发仿真工程师项目实训
下载app
返回旧版
首页 成长助手 小邻学院 社区 发现
职业认证 企业服务 行业会议

登录解锁更多功能

还没有账号?立即注册

技术邻
技术引领职场价值
电话
0571-86682823
商务合作
service@jishulink.com
  • 全部  > 
  • CAE仿真

有没有大佬知道这个问题怎么解决有偿?

浏览: 3355

Abaqus/Standard Analysis exited with an error - Please see the  message file for possible error messages if the file exists.


1


   Abaqus 3DEXPERIENCE R2019x                                  Date 30-6月-2023   Time 11:56:01

   For use by Supplied by Team-SolidSQUAD under license from Dassault Systemes or its subsidiary.


                                                                                 

                                                                                 

 STEP    1     INCREMENT     1     STEP TIME    0.00    



                        S T E P       1     D Y N A M I C   A N A L Y S I S - I M P L I C I T  I N T E G R A T I O N



                                                                                          


          DYNAMIC APPLICATION PACKED SCHEME IS                 TRANSIENT FIDELITY  

          HILBER-HUGHES-TAYLOR (HHT) TIME INTEGRATOR IS USED


     AUTOMATIC TIME CONTROL WITH -

          A SUGGESTED INITIAL TIME INCREMENT OF                1.000E-02

          AND A TOTAL TIME PERIOD OF                            3.00    

          THE MINIMUM TIME INCREMENT ALLOWED IS                1.000E-08

          THE MAXIMUM TIME INCREMENT ALLOWED IS                3.000E-02

          SCALE FACTOR ON TIME AVERAGE FORCE FOR HALF-

           -INCREMENT RESIDUAL COMPUTATIONS IS                 1.000E+03


          HILBER-HUGHES-TAYLOR METHOD PARAMETERS:  ALPHA   IS  -5.000000E-02

                                                   BETA    IS   0.275625    

                                                   GAMMA   IS   0.550000    

          SINGULAR MASS TREATMENT TYPE IS                     ERROR

          CONSERVATIVE TIME INCREMENTATION IS USED

          STEP AMPLITUDE IS                                    STEP


 CONVERGENCE TOLERANCE PARAMETERS FOR FORCE    

     CRITERION FOR RESIDUAL FORCE     FOR A NONLINEAR PROBLEM          5.000E-03

     CRITERION FOR DISP.    CORRECTION IN A NONLINEAR PROBLEM          1.000E-02

     INITIAL VALUE OF TIME AVERAGE FORCE                               1.000E-02

     AVERAGE FORCE     IS TIME AVERAGE FORCE    

     ALTERNATE CRIT. FOR RESIDUAL FORCE     FOR A NONLINEAR PROBLEM    2.000E-02

     CRITERION FOR ZERO FORCE     RELATIVE TO TIME AVRG. FORCE         1.000E-05

     CRITERION FOR RESIDUAL FORCE     WHEN THERE IS ZERO FLUX          1.000E-05

     CRITERION FOR DISP.    CORRECTION WHEN THERE IS ZERO FLUX         1.000E-03

     CRITERION FOR RESIDUAL FORCE     FOR A LINEAR INCREMENT           1.000E-08

     FIELD CONVERSION RATIO                                             1.00    

     CRITERION FOR ZERO FORCE     REL. TO TIME AVRG. MAX. FORCE        1.000E-05

     CRITERION FOR ZERO DISP.    RELATIVE TO CHARACTERISTIC LENGTH     1.000E-08


 CONVERGENCE TOLERANCE PARAMETERS FOR MOMENT   

     CRITERION FOR RESIDUAL MOMENT    FOR A NONLINEAR PROBLEM          5.000E-03

     CRITERION FOR ROTATION CORRECTION IN A NONLINEAR PROBLEM          1.000E-02

     INITIAL VALUE OF TIME AVERAGE MOMENT                              1.000E-02

     AVERAGE MOMENT    IS TIME AVERAGE MOMENT   

     ALTERNATE CRIT. FOR RESIDUAL MOMENT    FOR A NONLINEAR PROBLEM    2.000E-02

     CRITERION FOR ZERO MOMENT    RELATIVE TO TIME AVRG. MOMENT        1.000E-05

     CRITERION FOR RESIDUAL MOMENT    WHEN THERE IS ZERO FLUX          1.000E-05

     CRITERION FOR ROTATION CORRECTION WHEN THERE IS ZERO FLUX         1.000E-03

     CRITERION FOR RESIDUAL MOMENT    FOR A LINEAR INCREMENT           1.000E-08

     FIELD CONVERSION RATIO                                             1.00    

     CRITERION FOR ZERO MOMENT    REL. TO TIME AVRG. MAX. MOMENT       1.000E-05


     VOLUMETRIC STRAIN COMPATIBILITY TOLERANCE FOR HYBRID SOLIDS       1.000E-05

     AXIAL STRAIN COMPATIBILITY TOLERANCE FOR HYBRID BEAMS             1.000E-05

     TRANS. SHEAR STRAIN COMPATIBILITY TOLERANCE FOR HYBRID BEAMS      1.000E-05

     SOFT CONTACT CONSTRAINT COMPATIBILITY TOLERANCE FOR P>P0          5.000E-03

     SOFT CONTACT CONSTRAINT COMPATIBILITY TOLERANCE FOR P=0.0         0.100    

     CONTACT FORCE ERROR TOLERANCE FOR CONVERT SDI=YES                 1.00    

     DISPLACEMENT COMPATIBILITY TOLERANCE FOR DCOUP ELEMENTS           1.000E-05

     ROTATION COMPATIBILITY TOLERANCE FOR DCOUP ELEMENTS               1.000E-05


ABAQUS

全部回答 (0)

默认 最新

相似问题

查看全部
  • abaqus计算不收敛? 4个回答

    abaqus模型计算不收敛,错误为Too many attempts made for this increment msg文件中error: MAX. PENETRATION ERROR 2.32051 AT NODE GP-1.795623 OF CONTACT PAIR (GENERAL_CONTACT_FACES_123,GENERAL_CONTACT_FACES_121) MAX. CO

  • ABAQUS不收敛原因求助? 1个回答

    ***WARNING: THE SYSTEM MATRIX HAS 1 NEGATIVE EIGENVALUES. EXPLANATIONS ARE SUGGESTED AFTER THE FIRST OCCURRENCE OF THIS MESSAGE. ASYNCHRONOUS TRACKING ELEMENT LOOP STARTED CONVERGENCE CHECKS FOR EQUIL

  • 1个回答

    MAX. PENETRATION ERROR 34.4485E-09 AT NODE 270821 OF CONTACT PAIR (S2,S1) MAX. CONTACT FORCE ERROR -18.3432E-09 AT NODE 270738 OF CONTACT PAIR (S2,S1) THE CONTACT CONSTRAINT ERRORS ARE WITHIN THE TOLE

推荐阅读

【精品课程】ANSA For LSDYNA从入门到精通(完结)

【精品课程】ANSA For LSDYNA从入门到精通(完结)

Wonderful仿真 Wonderful仿真
¥699
0#块箱梁托架法施工结构模拟

0#块箱梁托架法施工结构模拟

yudachuan1105 yudachuan1105
¥200
新一代智能头灯的动态设计评估与仿真

新一代智能头灯的动态设计评估与仿真

Ansys中国 Ansys中国
免费
UG培训第九课:自由曲面构造法

UG培训第九课:自由曲面构造法

luffy8610 luffy8610
¥20
应用ANSYS瞬态动力学法模拟啮合齿轮的高速转动

应用ANSYS瞬态动力学法模拟啮合齿轮的高速转动

夏日星空 夏日星空
¥35
一线科技工作者接受仿真咨询服务的全过程经验分享

一线科技工作者接受仿真咨询服务的全过程经验分享

技术邻直播 技术邻直播
免费
UG有限元基础教程

UG有限元基础教程

moonshine🤓 moonshine🤓
免费
ABAQUS桁架结构强度分析

ABAQUS桁架结构强度分析

wj_2704 wj_2704
¥500