SimSolid用户案例——大型设备

图片1.png

    324 part chain assembly

    871 part full platform assembly

图片2.png

    770 part assembly   

  “When we're ordering tons and tons of the raw materials for our chains, a pound here and a pound there starts becoming important, so that's where we spend a lot of time trying to optimize our product.” Applying SimSolid to this challenge “in the long run will make us a lot of money.” 

                                                                                                                Bob Adams

                                                                                                                Serapid engineering manager

“为供应链订购数以吨计的原材料时,林林总总的每一磅就变得非常重要,因此,我们会花大量时间来优化产品。从长远来看,运用 SimSolid 应对这一挑战将为我们带来很多收益。”

                                                                                                               Bob Adams

                                                                                                                Serapid engineering manager


    【想获得更多信息,请加技术邻微信客服 jishulink888。也可以申请试用、免费测算、报名培训、研发人员20人以上的企业可以申请免费上门内训


登录后免费查看全文
立即登录
App下载
技术邻APP
工程师必备
  • 项目客服
  • 培训客服
  • 平台客服

TOP

1